| Feature | Traditional Unit | Griffin 2050 |
|---|---|---|
| F.E.A. designed | no | Yes, to exceed craning operations in 2m H’s and F6 with a safety factor of 2 |
| Single point lift | no | yes |
| Certified for lifting | yes | yes |
| Removable waste tank | no | yes |
| 100% sealed tank | no | yes |
| DIN 16194 compliant waste tank | no | yes |
| Cabin 100% sealed from waste in the event of knockdown | no | yes |
| Sealed tank vent | for transit only | yes |
| Bunded floor | no | yes |
| Cabin removed for service onshore | yes | no |
| External framework | yes | no |
| Monocoque construction | no (pop riveted panels) | yes |
| Hot water hand wash | no | yes |
| Rotamoulded one piece construction | no | yes |
| Corrosion resistant | no | yes |
| Marine toilet | no | yes |
| Embedded wheels for positioning | no | yes |


Griffin Special Projects Ltd
Beacon Innovation centre, Beacon Park, Gorleston, Great Yarmouth, NR31 7RA